AT&T DevEx

Core Capabilities

1. Customer Authentication

Purpose: Validate the customer’s identity and establish a secure session required for all downstream change‑order operations.

Supported actions:

  • Authenticate via passcode or last 4 digits of SSN, paired with billing account number and current service address ID.
  • Enforce authentication as a mandatory gate (no change‑order actions without verified identity).
  • Maintain a secured session context for downstream change‑order steps.

2. Customer Search (Account Profile Retrieval)

Purpose: Retrieve the authenticated customer’s account profile and context needed to drive plan/change eligibility and ordering.

Supported actions:

  • Retrieve full account profile (associated individuals, billing account details, service type, account status, current service address).
  • Support Fiber-specific retrieval using serviceType: FIBER.
  • Return billing account number, account state, and service address context required for current plan lookup, offer eligibility, and cart creation.

3. Address Validation

Purpose: Verify and normalize customer addresses to prevent downstream ordering, billing, and fulfillment errors.

Supported actions:

  • Validate and standardize addresses against AT&T and USPS standards.
  • Support PPU, billing, and shipping address types.
  • Support change flows where an alternate fulfillment/shipping address is needed (e.g., equipment delivery for an add‑on).

4. Products & Offers Discovery

Purpose: Retrieve eligible base plans, add‑ons, and promotions available for a change order.

Supported actions:

  • Retrieve change‑scoped offers using the customer’s billing account number.
  • Return base plan options (e.g., BBOffers) to support upgrade/downgrade scenarios.
  • Surface incompatibilities/conflicts between base plans and add‑ons (e.g., CRP conflicting offers).
  • Support hyper‑local pricing based on the customer’s service location.
  • Include eligible promotions and reward cards based on channel and customer profile.

5. Shopping Cart

Purpose: Build and manage a draft change order as structured cart line items representing plan and add‑on modifications.

Supported actions:

  • Support “replace offer to” actions for plan upgrades/downgrades (Change Rate Plan).
  • Support “add” actions for new add‑ons (e.g., HomeTech Protection, All‑Fi Pro, coverage plans, equipment).
  • Support combining a plan change with multiple add‑ons in a single cart.
  • Support iterative cart updates: add items, delete specific items, delete all items.
  • Recalculate pricing and validate compatibility after each cart update.

6. Checkout Configuration

Purpose: Determine installation/fulfillment options and present the contract terms required prior to submission.

Supported actions:

  • Retrieve available fulfillment options and technician appointment windows when required by the plan change or add‑on.
  • Present required terms and conditions keys for acceptance (e.g., MRC_GEN, ABP).
  • Support alternate fulfillment/shipping address scenarios when equipment shipping differs from the service address.

7. Payments

Purpose: Register and securely tokenize the payment method used for the change order and future billing (as applicable).

Supported actions:

  • Tokenize credit card, debit card, or bank account payment methods.
  • Associate tokenized payment method(s) with the cart ID.
  • Save payment profiles for future reuse (when permitted).
  • Support validation (e.g., zero‑amount check) and authorization (charge amount check) as separate operations.
  • Capture consent for terms and conditions related to stored payment methods.

8. Express Submit Order

Purpose: Submit the completed change order to fulfillment systems and return confirmation details.

Supported actions:

  • Submit using cart ID, tokenized payment method(s), enrollment preferences (autopay/paperless), accepted terms keys (e.g., MRC_GEN, ABP), and selected installation appointment.
  • Return order confirmation artifacts (customer order ID, order state, submission date, order summary access token).
  • Acknowledge successful submission and transition the change order into the fulfillment pipeline for provisioning.